Interlaken, NY
Project scope
Third party engineering firm provided requirements for this school which is vulnerable to runoff flooding. Custom solutions of FloodBarricade for vents and individual doors, combine with FloodWall for long stretches met the requirements provided.
Application: Integrated Protection
System: Mixture of FloodBarricades and V1200 (4’) FloodWalls